Northern Beaches Hospital Road Connectivity and Network Enhancement

We are helping to increase the capacity of the road network to provide a better travel experience and improved access to this healthcare precinct.



Location

  • Sydney, Australia

Project Value

  • AUD 700M

Project Status

  • Complete

Network enhancement, improving access and providing a better travel experience

Transport for NSW has invested $700 million to upgrade the road network around the new Northern Beaches Hospital, with the road network scheduled to be completed by mid-2020.

 

TfNSW engaged Ferrovial Agroman and York Civil (FYJV) to deliver the design and construction of the project. WSP was engaged as the Project Verifier.

 

As part of our engagement, we provided independent design and construction verification services including project works, temporary works, landscaping maintenance and performance of the contractor.

Northern-Beaches-Hospital-Road-Aerial

The project was delivered in two stages:

Stage 1: Hospital Connectivity – surface works associated with intersection upgrades and improvements to accommodate the increased traffic generated by the new Northern Beaches Hospital on Forest Way, Frenchs Forest Road, Wakehurst Parkway and Warringah Road.

 

Stage 2: Network Enhancement – the main works associated with improving traffic movements along Warringah Road including a 1.3km long underpass for Warringah Road through traffic between Forest Way in the west and Rodborough Road in the East.

 

Once fully operational, these upgrades will provide customers with a better travel experience by car or bus, increase the capacity of the road network and improve access through the precinct.

Design Packages
80+ 80+
overpass bridges
3 3
pedestrian bridges
2 2
vehicles per day through
140,000+ 140,000+