The existing ventilation and air conditioning systems were redesigned according to the new needs and totally renewed. The heat output was adapted to the new needs. We have also taken over the coordination of the installations of the building and medical technology.
Challenge
The new fire protection regulations and sound and climate requirements for hospital construction were implemented during the realization, which represents a major challenge for an existing building. In addition, carrying out the work as quietly as possible while the hospital was in operation and out of respect for the patients was a matter of high priority.