Streamlining Capital Project Delivery Through Consolidation, Progressive Design-Build

As part of a progressive design-build team delivering multiple intersecting projects in Charlotte, North Carolina, WSP USA is helping the owner realize the benefits of alternative delivery and contract consolidation.

[Insert your title here]

The Center City area of Charlotte is one of the fastest growing metropolitan areas in the U.S., experiencing tremendous redevelopment along the Charlotte Area Transit System (CATS) light rail transit corridor.

One caveat of this accelerated building rate is the strain it is putting on local infrastructure, especially on the need for the sanitary sewer collection system to handle increased capacity and wet weather flows.

To meet this demand, the City of Charlotte is advancing numerous capital improvement projects aimed to increase capacity of its collection system in this area, which includes the central business district (CBD), uptown, midtown and south end sections of the city.

Two of the sewer capacity upgrade projects identified in a 2017 capacity assessment study of the CBD were prioritized for completion and won by the WSP team. Together, the projects involve replacing existing 8- to 12-inch sewer mains, and upsizing mains between 16-inch and 30-inch, for a total of approximately 12,000 feet.

This project is divided into three phases. Phase 1 construction is complete, Phase 2 construction is in progress, and Phase 3 is in final permitting phase. Construction completion is targeted for mid-2020.

©WSP USA

The project included a streetscaping/pedestrian access improvement project on 16th Street to enhance access to the CATS Light Rail.

More Streamlining Opportunities

During stakeholder meetings for this project, WSP discovered there were two other city department projects being planned in the project area.

The first project, planned by the Storm Water Services Department, was a $10 million storm drainage culvert improvement in 16th Street that was on hold due to funding limitations and project prioritization. The other was a Charlotte Department of Transportation (CDOT) streetscaping/pedestrian access improvement project on 16th Street to enhance access to the CATS Light Rail.

“Under the traditional design-bid-build project delivery approach, it is likely these three projects would be constructed independently on the same street, requiring closure of 16th street on two different occasions for a significant duration, which would limit access to the CATS Blue Line,” said Chip Smith, WSP project manager. “Although the other City departments had not embraced alternative delivery, our team’s relationships with both allowed us to convince them that it was best for the city and the community that the projects be combined and constructed at one time under our Charlotte Water progressive design-build project.”

The original guaranteed maximum price (GMP) for the Charlotte Water work was expanded to include the two additional projects.

One of the projects, Little Sugar Creek Tributary Trunk Sewer to North Tryon Street Sanitary Sewer Improvements Project, took on an added level of complexity during the GMP development.

“Because the GMP development process uses open book pricing, the owners could see how the GMP was developed prior to accepting it,” Smith said. “This process gave CDOT and the Storm Water Services departments confidence to move forward.”

The City of Charlotte will benefit by being able to accelerate the storm water improvements and the 16th Street pedestrian access projects simultaneously, in lieu of three city departments constructing projects at three separate times. The city also benefits by accelerating the real estate acquisition process for the two additional projects, as these services are part of our expanded contract.

“Our design-build team has developed project delivery solutions that provide a smooth design/GMP development that also saves the city money and time in the project schedule,” Smith added. “The project delivery process has proved very successful and provided Charlotte Water confidence that progressive design-build project delivery is suitable for conveyance projects like these.”

Based on the success of the Little Sugar Creek Tributary Trunk Sewer Project thus far, Charlotte Water procured another round of progressive design-build projects in the fall of 2018. The WSP team was selected to lead these projects based on its performance on the department’s inaugural projects using this delivery methodology.

[To subscribe to Insights, contact the editorial staff at insights@wsp.com.]

©WSP USA

Without the alternate delivery approach, it is likely independent construction of three projects on the same street would have led to additional and extended road closures.