Remotely located in Australia’s outback, Silverton Wind Farm will be Australia’s sixth largest onshore wind project.


Location

  • Silverton, New South Wales, Australia

Sector

  • Energy
  • Wind Energy
  • Program and Project Management
  • (View all)

Service

Client

  • Silverton Wind Farm Development Pty Ltd

Project Status

  • Completed

The Silverton Wind Farm in New South Wales, Australia, the country’s sixth largest, has an installed capacity of 200 megawatts. In a typical year, the wind farm could power more than 137,000 homes. Studies also indicate it will reduce annual greenhouse gas emissions by approximately 655,000 tons.

A joint venture of Catcon and GE are delivering the 58 WTG wind farm under an EPC contract, with TransGrid responsible for the connection works. It is targeted to be fully operational by mid-2018.

WSP is acting as the Lenders’ Independent Certifier during the construction phase of the wind farm. The team certifies project payment milestones, authorises drawing down of debt funds for the payment of project invoices including cost and time to complete tests and certifies project costs. WSP is also responsible for monitoring and reporting on construction progress including regular site visits to inspect the works.

GHG Emissions Reduced Annually
655,000 Tons
Homes Powered by Renewable Energy
137,000
Operational Capacity
200 MW

During the development of the project, WSP was separately contracted by Silverton Wind Farm Development Pty Ltd to provide full-time supervision of its preliminary geotechnical investigation program. The WSP team was responsible for assessing nine previously selected turbine sites and determining ground conditions. WSP provided recommendations for suitable foundations, including mass gravity turbine foundation structures. The team also made recommendations for batter slopes, excavations, and drainage.

A commitment to timely, effective communication enabled the investigation team to select appropriate foundations in a timely manner, ensuring the client met its deadlines in the project’s preliminary phase.