Design of Light Rail on the I-90 Floating Bridge Across Lake Washington | WSP Skip to content
  • Who We Are

    We are the sum of our collective passion, vision and expertise.

    Discover our people, purpose and stories that have helped shape the organization we are today and are inspiring the one we will become.

    Who We Are
    • What We Stand For
    • Our Story
    • Corporate Responsibility
    • Our Leadership
    Corporate Responsibility
    • Communities
    • Corporate Governance
    • Diversity and Inclusion
    • Ethics and Integrity
    • Health and Safety
    • Sustainability
    Featured Content

    Future Ready

    With Future Ready we see the future more clearly and challenge our teams across the world to advise…

  • What We Do

    We shape the communities of tomorrow and help society thrive.

    With an intimate sense of local realities, we look at complex problems from different angles and deliver solutions that break paradigms.


    View All

    • Sectors
    • Services
    • Projects
    What We Do
    • Property and Buildings
    • Transport and Infrastructure
    • Environment
    • Energy, Industry and Resources
    Featured Content

    Rapid Responses to the Impacts of COVID-19

    Helping clients globally to prepare, respond and recover

  • Insights

    Our global experts offer compelling insights that provide new perspectives.

    Read inspiring articles that challenge the status quo by reframing current issues, sparking fresh conversations and finding new solutions.

    View all
    Insights
    • Climate
    • Mobility
    • Places
    • Resources
    • Society
    • Technology
    Featured Content

    Digital Twins Contribute to Infrastructure…

    Driving optimal outcomes for projects and communities

  • Careers

    Help us shape the future

    Join a collaborative team of experts that thrives on complex challenges and unconventional thinking.

    See more
    Careers
    • Join Us
    • Early Career
    • Experienced Professionals
    • Why Choose WSP
    Featured Content

    WSP is hiring in power

    Care to join us in doing purposeful, sustainable work that helps shape communities and the future?…

  • Who We Are
    • What We Stand For
    • Our Story
    • Corporate Responsibility
      • Who We Are
      • Accountable for Tomorrow
        • Communities
        • Corporate Governance
        • Diversity and Inclusion
        • Ethics and Integrity
        • Health and Safety
        • Sustainability
    • Our Leadership
  • What We Do
    • Property and Buildings
    • Transport and Infrastructure
    • Environment
    • Energy, Industry and Resources
  • Insights
    • Climate
    • Mobility
    • Places
    • Resources
    • Society
    • Technology
  • Careers
    • Join Us
    • Early Career
    • Experienced Professionals
    • Why Choose WSP
Back

We are locally dedicated with international scale.

Malaysia - English

International

  • Global
    English - Français

Americas

  • Canada
    English - Français
  • Chile
    Español
  • Colombia
    Español
  • Mexico
    Español
  • Panama
    Español
  • Peru
    Español
  • United States
    English

Africa

  • South Africa
    English

Asia

  • China
    中文(简体) - English
  • Hong Kong
    English
  • India
    English
  • Malaysia
    English
  • Philippines
    English
  • Singapore
    English
  • South Korea
    한국어(대한민국) - English
  • Thailand
    English

Europe

  • Denmark
    Dansk
  • Finland
    Suomi
  • France
    Français
  • Germany
    Deutsch
  • Greenland
    Kalaallisut - English
  • Netherlands
    Nederlands
  • Norway
    Norsk
  • Poland
    Polski - English
  • Romania
    English
  • Spain
    Español
  • Sweden
    Svenska - English
  • Switzerland
    Deutsch - English
  • United Kingdom
    English

Middle East

  • Kuwait
    English
  • Oman
    English
  • Qatar
    English
  • Saudi Arabia
    English
  • United Arab Emirates
    English

Oceania

  • Australia
    English
  • New Zealand
    English
Worldwide Offices
    • Investors

      Discover our diverse business, financial results and strategic ambitions.

      We are committed to delivering sustainable value to our shareholders and exceptional professional services to our clients.

      Read more
      Investors
      • Corporate Governance
      • Press Releases
      • Reports & Filings
      • Stock Information
      • Shareholder Information
      • Presentations and Events
      Corporate Governance
      • Audit Committee
      • Board of Directors
      • Business Conduct Hotline
      • Constating Documents
      • Governance Documents
      • Governance Ethics and Compensation Committee
      • Mandates
      Reports & Filings
      • AIF
      • Annual
      • Information Circular
      • Quarterly
      • SEDAR Filings
      • Sustainability
      Stock Information
      • Analyst Coverage
      Shareholder Information
      • Acquisitions
      • Dividends
      • Drip
      • FAQ
      Featured Content
      Thn-Web-Q42020-Results

      WSP's Q4 and 2020 Results

      We released our 2020 fourth quarter and fiscal results on February 24, 2021 after market close.

    • Investors
      • Corporate Governance
        • Investors
        • Corporate Governance
          • Audit Committee
          • Board of Directors
          • Business Conduct Hotline
          • Constating Documents
          • Governance Documents
          • Governance Ethics and Compensation Committee
          • Mandates
      • Press Releases
      • Reports & Filings
        • Investors
        • REPORTS & FILINGS
          • AIF
          • Annual
          • Information Circular
          • Quarterly
          • SEDAR Filings
          • Sustainability
      • Stock Information
        • Investors
        • Stock Information
          • Analyst Coverage
      • Shareholder Information
        • Investors
        • Shareholder Information
          • Acquisitions
          • Dividends
          • Drip
          • FAQ
      • Presentations and Events
    • News

      Progress happens quickly.

      Stay up to date with our latest global news, events, awards and more.

      News
      • Latest News
      • Press Releases
      Featured Content

      Scaling Up Healthcare Capacity At Speed

      With the spread of the COVID-19 pandemic, our global healthcare network and specialist teams have…

    • Contact us

      We are dedicated to our local communities and driven by global talent.

      Contact us to find out how our diversified offering, world-class expertise and geographical reach can assist you in achieving your vision.


      Follow us

      Contact us
      • Send a Message
      • Offices
    • Investors

      Discover our diverse business, financial results and strategic ambitions.

      We are committed to delivering sustainable value to our shareholders and exceptional professional services to our clients.

      Read more
      Investors
      • Corporate Governance
      • Press Releases
      • Reports & Filings
      • Stock Information
      • Shareholder Information
      • Presentations and Events
      Corporate Governance
      • Audit Committee
      • Board of Directors
      • Business Conduct Hotline
      • Constating Documents
      • Governance Documents
      • Governance Ethics and Compensation Committee
      • Mandates
      Reports & Filings
      • AIF
      • Annual
      • Information Circular
      • Quarterly
      • SEDAR Filings
      • Sustainability
      Stock Information
      • Analyst Coverage
      Shareholder Information
      • Acquisitions
      • Dividends
      • Drip
      • FAQ
      Featured Content
      Thn-Web-Q42020-Results

      WSP's Q4 and 2020 Results

      We released our 2020 fourth quarter and fiscal results on February 24, 2021 after market close.

    • Investors
      • Corporate Governance
        • Investors
        • Corporate Governance
          • Audit Committee
          • Board of Directors
          • Business Conduct Hotline
          • Constating Documents
          • Governance Documents
          • Governance Ethics and Compensation Committee
          • Mandates
      • Press Releases
      • Reports & Filings
        • Investors
        • REPORTS & FILINGS
          • AIF
          • Annual
          • Information Circular
          • Quarterly
          • SEDAR Filings
          • Sustainability
      • Stock Information
        • Investors
        • Stock Information
          • Analyst Coverage
      • Shareholder Information
        • Investors
        • Shareholder Information
          • Acquisitions
          • Dividends
          • Drip
          • FAQ
      • Presentations and Events
    • News
      • Latest News
      • Press Releases
    • Contact us
      • Send a Message
      • Offices
  1. We are WSP
  2. Insights
  3. Design of Light Rail on the I-90 Floating Bridge

Design of Light Rail on the I-90 Floating Bridge Across Lake Washington

Installing light-rail transit across a floating roadway bridge presents many unique challenges, foremost of which is how to design the multidimensional moving joints at both ends of transition spans between the fixed and floating structures. 

map marker United States | Friday, 23 December, 2016
Reading Time : 7 minutes

A technical solution to this technical challenge has been proposed, analyzed, modeled, designed and prototype-tested in the context of the east link extension, a light rail transit project being carried out by Central Puget Sound Regional Transit Authority (Sound Transit).

In early 2011, Sound Transit selected a consultant team led by WSP, with Balfour Beatty, SC Solutions, Inc., and the Transportation Technology Center, Inc. (TTCI) as principal subconsultants, to tackle one of the more challenging aspects of the East Link Extension project: a light rail track bridge system on an Interstate 90 floating bridge across Lake Washington (the I-90 bridge). The approximately 5,700-foot long bridge comprises concrete box girder fixed segments (approach spans) supported by deep foundations, a floating segment supported by pontoons, and transition segments connecting the fixed and floating segments.

Two initial activities occupied the first few weeks of the project: a literature search to identify any other possible technical solutions that might exist for installing rail transit across a floating bridge, and a technical workshop led by key members of the consultant team, with key staff from Sound Transit and the Washington Department of Transportation (WSDOT), owner of the I-90 bridge. The literature search identified and documented a variety of rail joint configurations for handling various bridge movements, primarily in one direction or axis of rotation, but none for handling the combinations of movements and rotation of a floating bridge. 

Innovative CESuRa Concept for Track Rail Bridge

At the technical workshop, Mr. Andy Foan, Chief Engineer of Balfour Beatty Rail (UK) and one of two Balfour Beatty participants at the workshop, introduced the innovative Curved Element Supported Rail (CESuRa) track bridge concept. Upon thorough analysis and evaluation in Phase 1 of the project, the CESuRa concept was determined to be superior to other concepts studied, particularly in terms of its ability to support multiple movements and rotations at the same time, and was selected to proceed to design and testing in Phase 2. 

The I-90 floating bridge experiences the following normal movements . The required design ranges are shown in parentheses.

  • Surge - longitudinal x-axis movement of the floating segment and the track, handled through rail expansion joints.
  • Roll (+/- 0.7 degrees) - longitudinal x-axis rotation of the floating segment resulting from load and weather.
  • Yaw (+/- 0.1 degree) - vertical y-axis rotation caused by Sway, which is lateral z-axis movement of the floating segment resulting from load and weather.
  • Pitch (+/- 0.5 degrees) - transverse or lateral z-axis rotation of the floating segment caused by Heave, which is vertical y-axis movement resulting from changes in lake level.

Ability to accommodate many movements

The schematic features of the track bridge are illustrated in Figure 2. Two steel “wings” span the bridge (hinge) joints connecting the fixed and transition segment bridge decks (and the transition and floating segment decks). These wings form triangular secondary planes located such that they each have one (long) edge perpendicular to the hinge and a vertex on the hinge axis. A curved element called the “yoke” is placed on each wing, and the track is mounted on “bearer bars” supported by the yoke.

  • When the hinge angle is zero and the wings are lying flat, an observer looking from the side in the direction of the hinge axis will see the yoke as a straight line.
  • As the hinge angle increases, the wings will incline inwards as the long edges are forced upwards. The observer would then see a developing curvature as the yoke rises on the sloping wing, and the bearer bars would appear to the observer to lie on a smooth yet continuously variable curve that is tangential at either end to the incoming/outgoing tracks.
  • When the hinge angle is positive upwards, the track is in a segmental vertical sag curve.
  • When the hinge angle is negative downwards, the track is in a segmental vertical crest curve.

In this way, the track is supported across each moveable joint in a continuous and automatically conforming alignment and profile.

Innovative design of CESuRa components

The components of the CESuRa track bridge joint are illustrated in Figure 3. The rail and guard rail subsystems are supported by the bearer bars: the 115RE continuous welded (running) rails are supported by bolting two direct-fixation (DF) track fasteners to each bearer bar, and the two 8-inch tall by 8-inch wide by ½ inch thick steel angle guard rails are pinned to the bearer bars just inside the DF fasteners.  The 17 variable-length bearer bars are supported near their ends by friction pendulum bearings mounted in a curved pattern on a pair of wings approximately 42.5 feet long. These 17 bearings mounted as a group on each wing in a semi-circle are referred to as the “yoke,” shown in Figure 2.  

Each wing is stiffened by an upturned edge beam, and the wing and edge beam together form a continuous steel box fabricated from A572, Grade 50, welded steel plate. Each wing is supported by three steel laminated elastomeric bearing configurations. Each bearing experiences rotational movement in multiple planes as the bridge moves, plus compression under traffic. The bearings at the transition span ends are allowed to slide longitudinally but are constrained laterally. In an extreme event where the rotation and/or translation exceeds the bearing design limits, the bearings or mountings act as structural “fuses” by fracturing, protecting the bridge from damage.

The design uses longitudinally free fasteners on the track bridge. The rail clip is a tension clamp that is bolted in place, with plates and pads under the rail foot and between the rail and the rail clip to permit “free” (low-friction) sliding of the rail with thermal and bridge movement. The rails will be free to move longitudinally over the track bridges to accommodate changes in Pitch and Surge. Rail expansion joints will be installed on the first floating span on the lake side of each interior joint. The design accommodates lake level changes of +/- 18 inches from the median “neutral” position.

Confirmation through full-scale prototype testing

Full-scale testing was conducted at the Transportation Technology Center (TTC) outside of Pueblo, Colorado, in the summer and fall of 2013. Balfour Beatty Rail Infrastructure, Inc. built the Sound Transit Test Track (STTT), a customized 5,000-foot test track designed by the consultant team during Phase 1 (see Figure 4), and Jesse Engineering in Tacoma, Washington, fabricated two full-scale prototype track bridges that were shipped to the TTC for installation, instrumentation, and testing. 

Lessons learned for construction and installation

The results of the full-scale prototype testing program confirmed that the proposed design met the track bridge system technical requirements and provided valuable experience in fabrication, installation, adjustment and maintenance of the prototype track bridges. 

Lessons were learned in the track bridge fabrication, construction, shipping and installation, and in the multiple testing phases of the program, all of which will benefit and improve the final fabrication, shipping and installation of the eight production track bridges to be installed on the I-90 bridge, most likely in 2019. After testing was completed in Pueblo, the two prototype track bridges were shipped back to Seattle, disassembled and stored so that the parts can be reused in the production of the final production units. WSP is currently completing Issue for Construction documents, anticipating the start of construction in the spring of 2017.

Note: The project received a WSP 2014 US Project of the Year Award.  This article was excerpted and adapted from a paper submitted to the Transportation Research Board for presentation and publication in January 2017.

This article was co-authored with Thomas Cooper (WSP USA, Denver).


More on this subject

thn-wp-alliance-contracting

February 2021

Leveraging Project Procurement and Delivery Approaches for Positive Outcomes

White Paper
Mobility , Places , Resources , COVID-19 , Resilience
Indigenous Cultures-Thumbnail

February 2021

Embracing Indigenous Cultures to Address Infrastructure Needs

Feature
Places , Resilience , Society
thn-Winners-without-losers-better-normal

February 2021 | 8 minutes

Net Zero: Can We Have Winners Without Losers?

Blog
Places , Resilience , COVID-19
thn-Web-Maritime_Reefer

February 2021

Setting sail for more efficient and greener trade by sea

Feature
Climate , Mobility , Resilience
thn-what-else-Net-zero-better-normal

January 2021 | 11 minutes

What Else Can Net Zero Do For Us?

Blog
Resilience , Resources , Society , COVID-19
Thn-Web-VZ-ITS-Article6

December 2020

Creating Safe Road Ecosystems

Feature
Mobility , Technology , Places , Society
thn-wsp-uber-whitepaper

December 2020

Future Ready Kerbside: Creating Places That Put People First

Australia
White Paper
Places , Resilience , Society
Thn-Web-VZ-ITS-Article5

November 2020

Designing Out Flaws Within Road Transportation Systems

Feature
Mobility , Places , Resilience , Society , Technology
thn-news-waterways

November 2020 | 2 minutes

Water at the heart of long-term thinking for sustainable urban development

New Zealand
Feature
Places , Climate , Society
Thn-Web-Insight-TI-Electric-Vehicles

November 2020

Continuing the Shift to Electric Vehicles

Feature
Mobility , Places , Technology
Cities after COVID

November 2020 | 15 minutes

Cities After COVID: How Can We Create A Positive Legacy For Health And Wellbeing?

Feature
COVID-19 , Places , Resilience , Society
Thn-Hero-VZ-WDOR-2020

November 2020

Achieving Vision Zero Road Safety

Feature
Mobility , Resilience , Society

Author

John Harrison
United States

Share this page

  • Share on Facebook - Warning, this link will open a new tab.
  • Share on Linkedin - Warning, this link will open a new tab.
  • Share on Twitter - Warning, this link will open a new tab.
  • Share on Skype - Warning, this link will open your Skype application.


Related themes and tags

  • Places (156)

  • Resilience (182)


  • Asset Management (32)
  • Transportation (153)
  • Infrastructure (93)
  •   Page will open in a new tab
  •   Page will open in a new tab
  •   Page will open in a new tab
  •   Page will open in a new tab
  •   Page will open in a new tab
  • Who We Are
  • What We Stand For
  • Our Story
  • Future Ready
  • Our Leadership
  • Our Offices
  • What We Do
  • Sectors
  • Services
  • Projects
  • Insights
  • Climate
  • Mobility
  • Places
  • Society
  • Resources
  • Technology
  • Careers
  • Join Our Team
  • Spontaneous Application
  • Corporate
  • Sustainability
  • Health and Safety
  • Investors
  • Business Conduct Hotline
  • News
  • Corporate Governance
  • Ethics and Integrity
    ©2021 WSP
    • The WSP Logo
    • Privacy Policy
    • Anti-Spam commitment
    • Cookie Policy
    • Terms of Use
    ©2021 WSP

    Exiting our Website

    You are about to leave WSP.com and are being redirected to a job opportunity at Louis Berger, which has been recently acquired by WSP in the US.