WSP provides clients with mining-specific environmental services across all stages of the mining life cycle, from exploration and pre-feasibility and feasibility, through to operation, decommissioning and closure. Since no two mining projects are the same, we tailor our environmental services to the current stage of your mining project in order to meet your immediate needs. 


Sector

Service

  • Mine Infrastructure
  • Mine Water Management
  • Air Quality
  • (View all)

The mining industry has been transformed by society’s anticipation that mining operations meet more rigorous environmental standards. New, more demanding regulations have been adopted, aiming to protect the environment and resolve complex social issues.

Mining companies are adjusting to changes and are operating in a more sustainable manner, taking the biophysical, social and economic environments into consideration. Reputable mining companies are proactively contributing to the societies and communities in which they operate and report in accordance with global best practice.

Assisting Throughout the Mining Lifecycle

WSP provides a range of integrated environmental and engineering services and bespoke solutions to the mining sector across all stages of the project lifecycle, from exploration, prefeasibility and feasibility, through to operation, decommissioning and closure. We offer environmental planning, project and risk management for all phases of environmental authorisations.  In addition, we have a range of specialist services which can add value to any operation.

Our multidisciplinary team provides world-class expertise in the following areas:

AIR QUALITY AND ACOUSTICS

  • Environmental Acoustic Monitoring
  • Environmental Acoustic Impact Assessments
  • Ambient Air Quality Monitoring
  • Air Quality Impact Assessments (AQIAs)
  • Air Quality Management Plans (AQMPs)
  • Atmospheric Impact Reporting (AIR)
  • Greenhouse Gas Emission Inventories

ENVIRONMENTAL

  • Database Management and Geographic Information Systems (GIS)
  • Ecological Inventories (Fauna and Flora) and Biodiversity Studies
  • Environmental and Social Screening / Scoping Studies
  • Environmental and Social Impact Assessments (ESIAs)
  • Environmental Authorisations and Permitting (Air, Waste, Water Etc.)
  • Environmental and Social Management Plans (ESMPs)
  • Environmental, Social, Governance (ESG) and Health and Safety Due Diligence
  • Environmental Legal Compliance Auditing
  • Population Resettlement and Compensation Plans
  • Socio-Economic Surveys, Studies and Impact Assessments
  • Stakeholder Engagement / Public Consultations / Environmental Communications

LAND RESTORATION & GROUND ENGINEERING

  • Contaminated Land and Remediation
  • Environmental Engineering
  • Environmental Monitoring
  • Environmental Toxicology and Risk Assessment
  • Mine Closure Planning and Rehabilitation
  • Soil and Land Capability

WATER

  • Acid Mine Drainage Characterisation
  • Flood Risk Assessment
  • Groundwater Resource Development
  • Mine Dewatering
  • Numerical Modelling (Hydrological and Hydrogeological)
  • Stormwater Management Planning
  • Water Efficiency Planning
  • Water Feasibility Assessments
  • Water Resource Impact Appraisal
  • Water Balances (Static and Dynamic)
  • Water Quality Assessments and Monitoring Plans 
  • Water Use Licensing 
  • Wetland Delineation and Assessment

WASTE MANAGEMENT

  • Waste Classification
  • Generation of Safety Data Sheets
  • Waste Stream Mass Balancing
  • Landfill Site Selection, Permitting and Environmental Monitoring 
  • Feasibility Assessments for Alternative Waste Management
  • Industry Waste Management Plans (IndWMP)
  • Licensing and Registration of Waste Management Activities

Our project experience

WSP was appointed independent environmental assessment practitioner to undertake an Environmental Impact Assessment for the Exxaro Coal Eerstelingsfontein Coal Mine. The proposed Eerstelingsfontein Coal Mine site was approximately 230 hectares, with the proposed mining method being open cast strip mining. The project involved comprehensive specialist scope of services, including terrestrial and aquatic ecology, surface water, groundwater, air quality, environmental noise, heritage, visual impact, socio-economic, blast and vibration, traffic and closure and rehabilitation. 

WSP was appointed to undertake an Environmental Impact Assessment for the establishment of a fourth open cast pit at the Anglo American Coal SA Isibonelo Colliery, termed Block Zimele. The Block Zimele area was approximately 141 hectares, with a coal capacity of approximately 9 million tons. The EIA included a water use license application and air quality specialist study. 
The Rietvlei Coal Company proposed to establish a greenfields opencast coal mine, north of Middelburg on the remaining extent and Portion 1 of the farm Rietvlei 397 in Mpumalanga. WSP undertook the environmental authorisation (EIA), waste management license, water use license and mining right application for the proposed project.