Many public and private railway asset owners outsource the operations and maintenance of their railway services, infrastructure and systems. They wish to ensure, through a clear and robust agreement, that they have good visibility and accountability of the assigned operator throughout the term of the agreement. They desire good maintenance of the assets entrusted to the operator to maximise the asset life and performance.
This webinar will look at key components of a robust owner/ operator agreement for urban railways that include civil infrastructure and track; stations; depots; railway systems and associated equipment, and will include recent case studies.
Presenters:
Joseph Wong - Director, Infrastructure, China Region - WSP in Asia
Tim Aldeburgh - Technical director, WSP in Asia