In its latest win, WSP Thailand is part of a consortium consisting of Epsilon Co.Ltd, Chotchinda Consultants Limited, MHPM Co., Ltd. and WSP (Thailand) Ltd. to manage the design and construction of this 253-km route between Bangkok and Nakhon Ratchasima.
The project will involve trackwork, train operation system installation, and signalling system installation as the first phase of the railway system that will ultimately connect Bangkok to Nong Khai on the boarder with Laos.
WSP is providing System Certification Services to the State Railway of Thailand. Services duration is 60 months.