EY is the anchor tenant of the new building which is now often called the EY Tower. With occupant wellness in mind it features floor to ceiling windows, allowing daylight to flood the interior space, and as a further way to promote a healthy lifestyle amongst occupants, changing rooms, showers and bike parking have been integrated into the design.
WSP provided electrical engineering, civil engineering, IT and security consulting services for this high-rise office tower. We integrated an efficient direct/indirect lighting system, along with daylight harvesting and occupancy based dimming control to optimise energy consumption.
100 ASW was designed and built with one integrated communication network for Building Automation System (BAS), electrical, metering, lighting, security, elevators, window controls, Wi-Fi, wayfinding and data service. We used over 91km of Power Over Ethernet (PoE) Cat6 cables for different systems such as heating valves, CCTV cameras and access control, improving reliability and safety as well as flexibility, and we integrated IP-based security and CCTV monitoring systems to reinforce security within the building. It is a complete end-to- end IP-based system directly integrated with the building’s centralised automation platform. To ensure continuous energy performance within the building, electronic sub-metering has been installed to monitor usage and wastage for all systems.