The Extraordinary Technical Challenges of A Unique Historic Restoration

The extraordinary technical challenges faced by WSP / Lievense during the renovation and expansion of Palais Het Loo, a 17th century palace and one of the Netherlands’ most popular museums, included jacking up the listed palace buildings, a discontinuous ground water level, a basement constructed underwater and an immovable deadline.

img-Palais-Het-Loo

img-Palais-Het-Loo4

img-Palais-Het-Loo-water

img-palais-het-loo3