Sai Kung Recreation Camp
Three blocks of 3-storey building total 99 units, each unit is 3m by 6m including wash room facilities. The unit are for 14 days quarantine purpose and not an isolation room. After used as quarantine centre, it shall be disassembled for use for other purposes.
Our services: Civil, structural and building services design consultant for the contractor including the utilities connection.
Junior Police Pat Heung Centre
Two storey with 126 units, each unit is 3m by 6m including wash room facilities. The unit are for 14 days quarantine purpose and not an isolation room. After used as quarantine centre, it shall be disassembled for use for Interim Housing at the different locations.
Our services: Civil, structural and building services design consultant for the contractor including the utilities connection.
Lei Yue Mun Park
234 units staked 1 or 2 storey. After used as quarantine centre, it shall be disassembled and rebuilt at other site for Interim Housing with 4-storey tall.
Our services: Structural design consultant.
Penny's Bay Phase 3A on Lantau Island
53 two-storey building blocks made up of 850 MiC modules. Ancillary building, such as Civil Aid Service’s command post and medical post, will also be included to support the operation of the facility. When the temporary quarantine centre ceases operation, the MiC modules allow the structure to be disassembled for other purposes.
Our services: Structural, civil and building services engineering design and MiC consultant.