Skip to content
WSP
WSP
  • Who we are
    We are the home of ambitious, passionate, and innovative engineering experts, scientists and advisors.

    Who we are
    • Overview
    • Our history
    • Corporate responsibility
    • Our leadership
    • Our impact
    Corporate responsibility
    • Overview
    • Communities
    • Ethics and integrity
    • Health and safety
    • Inclusion and belonging
    • Sustainability
    Featured content
    Thn-Web-Our-Impact
    Unlocking potential everywhere

    As Visioneers we see the potential everywhere, harnessing it to embrace the complex challenges of today’s world. Blazing the trails of purposeful innovation across new frontiers and designing a world where communities can thrive.

    Discover our latest projects highlighting our commitment to innovation, sustainability and engineering excellence. See how we’re shaping the future of communities around the globe.

  • What we do
    We work together with clients to plan, design, create and deliver innovative projects that shape the world.


    View All

    • Sectors
    • Services
    • Projects
    What we do
    • Overview
    • Property and Buildings
    • Transport and Infrastructure
    • Environment
    • Energy, Industry and Resources
    Featured content
    thn-EA-Supercharge-Tomorrow
    Supercharge tomorrow

    As global power demand rises, we’re helping clients across all sectors accelerate the transition to a secure, resilient, and low-carbon energy future. WSP is shaping smarter energy systems, built to meet today’s challenges and tomorrow’s opportunities.

  • Insights
    Our global experts offer compelling insights that provide new perspectives.

    Read inspiring articles that challenge the status quo by reframing current issues, sparking fresh conversations and finding new solutions.

    View all
    Insights
    • Overview
    • Climate
    • Mobility
    • Places
    • Resources
    • Society
    • Technology
    Featured content
    Thn-web-VV-landing
    Visioneer Voices

    Where thought leadership meets real-world impact.

  • Careers
    What if you could do the kind of work the world needs?

    With us, you can. Make your best impact with WSP, where the culture and people also make it the best work of your life.

    Find out more
    Careers
    • Overview
    • Job opportunities
    • Early career
    • Experienced professionals
    • Why join us?
    Featured content
    Thn-Web-Careers-Why-Join-WSP
    Why join us?

    At WSP, you will find the space you need to think bigger and build a career that’s right for you.

  • Who we are
    • Overview
    • Our history
    • Corporate responsibility
      • Who we are
      • Accountable for Tomorrow
        • Overview
        • Communities
        • Ethics and integrity
        • Health and safety
        • Inclusion and belonging
        • Sustainability
    • Our leadership
    • Our impact
  • What we do
    • Overview
    • Property and Buildings
    • Transport and Infrastructure
    • Environment
    • Energy, Industry and Resources
  • Insights
    • Overview
    • Climate
    • Mobility
    • Places
    • Resources
    • Society
    • Technology
  • Careers
    • Overview
    • Job opportunities
    • Early career
    • Experienced professionals
    • Why join us?
Select your language and location

We are locally dedicated with international scale.

International
  • Global
    English — Français
Americas
  • Canada
    English — Français
  • Latin America
    Español — Português
  • United States
    English
Africa
  • South Africa
    English
Asia
  • China
    中文(简体) — English
  • Hong Kong
    English
  • India
    English
  • Indonesia
    English
  • Malaysia
    English
  • Philippines
    English
  • Singapore
    English
  • South Korea
    한국어(대한민국) — English
  • Thailand
    English
Europe
  • Denmark
    Dansk
  • Finland
    Suomi
  • France
    Français
  • Germany
    Deutsch
  • Hungary
    English
  • Italy
    Italiano
  • Netherlands
    Nederlands
  • Norway
    Norsk
  • Poland
    Polski
  • Romania
    English
  • Spain
    Español
  • Sweden
    Svenska
  • Switzerland
    Deutsch — Français
  • Turkey
    Turkish
  • United Kingdom
    English
Middle East
  • Middle East
    English
Oceania
  • Australia
    English
  • New Zealand
    English
Worldwide offices
    • Investors
    • Investors
    • News
      Progress happens quickly.

      Stay up to date with our latest global news, events, awards and more.

      News
      • Overview
      • Latest news
      • Events and webinars
      Featured content
      thn-climate-change-2025
      Climate Change Webinars

      Discover case studies addressing climate change adaptation and mitigation projects. WSP experts will discuss frameworks and methodologies to tackle the impacts of climate change. 

    • Contact us
    • Investors
    • Investors
    • News
      • Overview
      • Latest news
      • Events and webinars
    • Contact us
bnr_mimiha_bridge

Mimiha Stream Bridge Replacement

The Mimiha Stream Bridge Replacement project is a powerful example of how infrastructure can serve as a bridge—both literally and figuratively—between people, place, and purpose.

bnr_mimiha_bridge

Mimiha Stream Bridge Replacement

The Mimiha Stream Bridge Replacement project is a powerful example of how infrastructure can serve as a bridge—both literally and figuratively—between people, place, and purpose.

  1. We are WSP
  2. What we do
  3. Projects
  4. Mimiha Bridge

 

Overview

The Mimiha Stream Bridge Replacement project exemplifies WSP’s commitment to delivering infrastructure that is technically robust, environmentally sensitive, and culturally responsive. Located approximately 8km west of Ruatāhuna, the original bridge—constructed in 1944—had reached the end of its service life, with significant structural deterioration posing safety risks to the community. Whakatāne District Council engaged WSP to lead the technical delivery of a full bridge replacement, with a clear mandate: ensure the new structure meets modern transport needs while honouring the cultural and environmental significance of the site. Central to this mandate is the embedding of a co-design philosophy—actively involving mana whenua and local stakeholders throughout the project lifecycle to ensure outcomes are shaped collaboratively and reflect shared values.


Share this page

  • Share on Facebook - Warning, this link will open a new tab.
  • Share on Linkedin - Warning, this link will open a new tab.
  • Share on Twitter - Warning, this link will open a new tab.
  • Share on Skype - Warning, this link will open your Skype application.

Location

  • Bay of Plenty, New Zealand

Client

  • Whakatāne District Council

Project Status

  • August 2025
  




 

Collaborative engagement

We worked closely with Te Uru Taumatua, Manawarū Tribal, and Whakatāne District Council to embed cultural values into every stage of the project. Through hui, workshops, and ongoing dialogue, we ensured that mana whenua perspectives shaped the design and delivery of the bridge. This partnership upheld Te Tiriti o Waitangi principles of participation, protection, and partnership.


 

Adaptability & innovation

The project was shaped by a flexible, iterative process that responded to evolving site conditions and stakeholder priorities. Drawing on lessons from similar projects across the Bay of Plenty and beyond, we ensured the final solution was future-proof, culturally aligned, and environmentally responsible.


 

Resilience-based decision making

Our technical team led the design of roadworks, hydrology, bridge structure, and environmental planning. By integrating early contractor insights, we were able to identify risks early, improve constructability, and streamline delivery. The design prioritised low-impact construction methods and sustainable materials, reducing the project’s carbon footprint while protecting the surrounding natural environment.


Project context and challenges

The aging bridge was no longer fit for purpose. Inspections revealed extensive decay in piers, corbels, and restraint timbers, with poor connections compromising structural integrity. Maintenance was no longer viable, and a full replacement was identified as the preferred strategy.

However, the project’s location within Te Urewera—a region of deep cultural and environmental importance—presented unique challenges. The solution needed to be technically sound, constructible, and aligned with the values of mana whenua, including Te Uru Taumatua and Manawarū Tribal.

The solution

WSP provided end-to-end support, from options assessment through to construction monitoring. Our approach was grounded in co-design principles and Early Contractor Involvement (ECI), ensuring that iwi partners and council stakeholders were actively engaged throughout the project lifecycle.

Outcome and impact

The new Mimiha Stream Bridge will restore safe and reliable access for local communities, replacing a deteriorated structure with one that reflects the values of the people and the place. The collaborative design process reduced risk, improved constructability, and strengthened relationships between iwi and council stakeholders.

Environmentally, the project minimised disruption through sensitive design and sustainable construction practices. Culturally, it stands as a model for how infrastructure can honour identity and uphold Te Tiriti-based partnerships. Socially, it delivers long-term benefits for the wellbeing of the Ruatāhuna community.

Why it matters

The Mimiha Stream Bridge Replacement project is a powerful example of how infrastructure can serve as a bridge—both literally and figuratively—between people, place, and purpose. More than just a structural upgrade, this project was co-designed with mana whenua, embedding mātauranga Māori and sustainability principles into every stage of the process.

By fostering genuine collaboration with Te Uru Taumatua and Manawarū Tribal, the project upheld Te Tiriti o Waitangi through partnership, participation, and protection. It demonstrates how infrastructure can reflect cultural identity, support local community wellbeing, and deliver long-term environmental stewardship.

Key services provided

  • Road, hydrology, and bridge design
  • Environmental planning
  • Project management and construction monitoring
  • Cultural co-design and stakeholder engagement

Sectors

  • Bridges and Civil Structures
  • Marine Infrastructure
  • Coastal Facilities
  • Cities and Communities

Services

  • Strategic Advisory for Bridges and Civil Structures
  • Bridge Seismic Design
  • Bridge Sustainability
  • Risk and Resilience for Bridges and Civil Structures

Other challenges that we have overcome

thn-city-rail-link-nz
Tāmaki Makaurau, Aotearoa / Auckland, New Zealand

City Rail Link

City Rail Link (CRL) is the largest and most complex transport infrastructure project ever undertaken in Aotearoa New Zealand. As part of Link Alliance, WSP has worked with City Rail Link Ltd and Link Alliance members to help deliver a twin-tunnel underground rail link through central Auckland, including new stations at Te Waihorotiu and Karanga-a-Hape and a redeveloped Maungawhau station. The project will transform how people move through Tāmaki Makaurau, increasing rail capacity, improving access to the city centre and wider region, and enabling faster, more frequent and better-connected journeys.

thn-kruunuvuorensilta-jarno haanpuro
Helsinki, Finland

Kruunuvuori Bridge

Helsinki’s Kruunuvuori Bridge, designed by WSP in Finland, is one of the world’s longest bridges solely for public transport, pedestrians and cyclists.

Auckland Harbour Bridge
Tāmaki Makaurau, Aotearoa / Auckland, New Zealand

Auckland Harbour Bridge

Bridges are often admired for their form, view and scale. However, their success is measured via the efficiency of daily operation—how quickly and seamlessly we can crossover.

thum_graphic map of sh129 intersection
Waikato, New Zealand

SH1/SH29 Cambridge to Piarere Intersection Upgrade

The SH1/SH29 intersection was considered one of the most dangerous intersections in New Zealand. With key safety upgrades in the works, WSP and project partners saw an opportunity to safeguard not just the community, but the land and its future. 

thn-thu-thiem-2-vinokoysisilta
Ho Chi Minh, Vietnam

Thu Thiem 2 cable-stayed bridge

A new landmark has risen in Ho Chi Minh City, Vietnam, which represents Finnish bridge know-how at its best: a magnificent cable-stayed bridge that crosses the Saigon River running through the city.

thn-website-Finland-Longest-Bridge
Parainen

Kirjalansalmi Bridge: Finland’s Largest Span

WSP has prepared the general and construction plans for the Kirjalansalmi Bridge as well as the road plans for the Kirjalansalmi and Hessundinsalmi bridges. The two new bridges replace aging infrastructure and provide smooth and safe traffic flow.

thumbnail-forder-valley-transport-planning
England, UK

Forder Valley Link Road: providing sustainable transport infrastructure for improved journeys

From environmental advisory to transport planning, from design to project and construction management, our team of experts have helped Plymouth City Council deliver a strategic piece of infrastructure in the South West.

Utah-Transit-Authority-Program-Management_Transport-Infrastructure-David-Sailors-2013
Utah, USA

Utah Transit Authority Program Management

Design, construction and operation of 113 kilometers of light and commuter rail to better serve Utah’s growing population

thn-wsp-aces-clean-hydrogen-storage-project
Utah, USA

ACES Delta I Hydrogen Production and Storage

World’s largest green hydrogen storage facility being developed in Utah with funding from the U.S. Department of Energy’s (DOE) Loan Programs Office will help scale low-carbon energy for western states. 

THUM Toyo (1)
Antioquia, Colombia

Toyo Tunnel

WSP contributed its experience to the largest tunnel project in America part of the megaproject of 18 tunnels, 30 bridges and 17 kilometers of open-air roads in Colombia.

thn-helsingin-bau-paastoskenaario2
Helsinki, Finland

The BAU scenario of Helsinki's emissions by 2050

WSP prepared an emissions scenario for the city of Helsinki to support climate management. The calculation model produces an overall estimate of the different emission measurement categories and enables region-based comparisons.

thn-Kicking Horse Canyon
Golden, British Columbia

Kicking Horse Canyon

Connecting the final piece of one of Canada’s most difficult highway upgrades.

See all projects
  •   Page will open in a new tab
  •   Page will open in a new tab
  •   Page will open in a new tab
  •   Page will open in a new tab
  •   Page will open in a new tab
  • Who We Are
  • Our history
  • Future Ready
  • Our leadership
  • Our offices
  • What We Do
  • Sectors
  • Services
  • Projects
  • Insights
  • Climate
  • Mobility
  • Places
  • Society
  • Resources
  • Technology
  • Careers
  • Join our team
  • Early career
  • Experienced professionals
  • Why join us?
  • Corporate
  • Sustainability
  • Health and safety
  • Investors
  • Business Conduct Hotline
  • News
  • Ethics and integrity
    ©2026 WSP
    • The WSP Logo
    • Privacy Policy
    • Anti-Spam commitment
    • Cookie Notice
    • Terms of Use
    • AI statement
    ©2026 WSP
    Exiting our Website

    You are about to leave WSP.com and are being redirected to a job opportunity at Louis Berger, which has been recently acquired by WSP in the US.