We provided full structural and civil engineering services, airside and aircraft gate planning and design, aircraft parking apron design, site electrical, interior and exterior lighting design, cost estimating, BIM and project management. Airport operations remained open during construction which included relocating and installing water lines, storm sewer drainage, aircraft fueling infrastructure, high mast lighting and sanitary sewers.
The building's systems infrastructure was raised above flood elevation to meet airport resiliency objectives — helping the project achieve LEED Gold designation for its sustainable design in 2023.
Travelers now enjoy enhanced amenities including a welcome lounge and rest areas, accessible new changing areas for parents, shops offering local products and relief areas for service animals. The connector also provides improved efficiency, functionality and connectivity for tenants and airport operators, with extra operational and administrative spaces.