WSP's team of 20 experts from Finland and the UK worked on the assessment continuously for a year before submitting the report in February 2025. The participants included biologists, ornithologists, ecologists, hydrologists, hydrogeologists and Natura experts. They analysed the impact of the mine on the entire 65 km² conservation area.
The result was a report of more than 800 pages, which presents the extensive research results in a clear and understandable way. After a six-month review, the authorities approved the assessment and described it as an "exceptionally well-prepared Natura assessment" – a report in which up-to-date scientific information has been considered and the assessment proceeds in logical chains of reasoning.
Full transparency and mitigation measures
Ore mining would take place at a depth of up to 800 metres below the western edge of the conservation area. All above-ground operations planned for the mine are located outside the Viiankiaapa conservation area.
The biggest environmental concern is the potential drawdown of groundwater due to mine dewatering and the impact on sensitive peatland habitats. WSP’s assessment found that, even with mitigation, significant adverse effects could not be entirely ruled out for certain priority habitats and rare plant species. According to the assessment prepared by our experts, significant adverse effects cannot be completely ruled out for certain habitat types and rare plant species, even if mitigation measures are taken.
A suite of mitigation measures, including the exclusion of the NE satellite ore body from mining plans (reducing the area and duration of groundwater drawdown), are planned. The assessment concluded that, with these measures, most adverse hydrological impacts can be reduced to minor or moderate levels, and significant harm to most protected habitats and species can be avoided. However, for a small proportion of the Natura area—particularly certain fens and wooded mires—residual risks of significant degradation remain, especially under worst-case hydrological scenarios.
Ultimately, the project’s approval will hinge on a government-level decision to grant an exception under conservation law, recognising both the project’s national significance and the lack of less-damaging alternatives.
WSP Expertise in Sustainable Mining: Sakatti Project Success
The Sakatti mining project shows that with extensive research data, open dialogue and adaptability, it is possible to promote the utilisation of natural resources while respecting natural values. At the same time, it highlights the scientific expertise of our experts and the strength of our multidisciplinary, multinational team.
You can read the update of the Natura assessment here: Update of the Natura assessment | Anglo American Finland.