The Thameslink programme upgraded a live north-south rail route through London, including infrastructure dating back to the 1860s. For Network Rail, we developed the safety programme for the European Train Control System (ETCS) in the central Core, enabling metro-style frequency while retaining a conventional signalling fallback. 

Location

  • London, United Kingdom

Client

  • Network Rail

Project Status

  • Completed
Rail upgrade completed in 2018
£6bn
Trains per hour (ETCS design capacity)
24
Previous trains per hour capacity
16
First mainline use of Automatic Train Operation with ETCS
1st
Minute headways (2-minute recovery mode)
2.5 min

Contact us

Eric Peissel
Global Director, Transport and Infrastructure
Canada
Show more Show less

Talk with our team about your project or explore career opportunities at WSP.

Contact us Join our team