Expansion of the Legislative Council Complex
Platinum Award (New Construction)
As Hong Kong’s first building expansion to use MiC modules with MiMEP atop an existing, fully operational structure, the project added about 12,000 m2 of gross floor area through a fast-track design and build approach. Extensive prefabrication reduced disruption, shortened the timeline and cut waste, enabling handover over three months early with zero major accidents.
Tung Chung Business Hub
Platinum Award (Under Construction)
A new benchmark for private commercial projects in Hong Kong, the project achieved over 93% MiMEP adoption through early planning and standardised design. BIM, AR-assisted inspection and robotics improved coordination, while detachable subframes and sustainable practices supported flexibility and reduced waste.
Hong Kong’s new performing arts landmark has adopted a Mega MiMEP 3.0 Packaging Approach in the construction stage. This milestone involved the completion of a mega-scale rooftop plant system using 81 free-standing MiMEP modules, raising the standard for modular construction across the region.
Lee Garden Eight
Platinum Award (Under Construction)
Lee Garden Eight adopted MiMEP from the earliest planning stage, achieving over 85% adoption with more than 7,400 prefabricated modules. Supported by BIM-to-Fabrication workflows, it improved safety, quality and sustainability, and set a benchmark for Hong Kong's private commercial developments.
Hong Kong’s First Zero-Carbon Chiller System Project at Nina Tower
Platinum Award (RMAA)
Nina Tower’s chiller replacement upgraded a mission-critical cooling system in a fully occupied super high-rise without interrupting service. Using MiMEP, BIM, prefabrication and robotics, seven legacy plants became six high-efficiency water-cooled plants, cutting energy use and carbon emission while improving reliability.
As one of the pioneering MiMEP projects in Hong Kong, the Modular Negative-Pressure Isolation Ward is a rapidly deployable, hospital-grade solution designed to relieve urgent capacity pressure and support infection control during the pandemic years. Combining factory-standard quality with “Hoist and Go” assembly, it showcased how the industry has pushed the boundary and inspires younger generations.
Other award-winning projects include:
- Improvement Works for Central Lab Humidity Control at Main Academic Building of HKUST – Gold Award (RMAA)
- Expansion of Lai King Building in Princess Margaret Hospital – Merit Award (Under Construction)
- MCP Discovery Cooling-As-a-Service – Merit Award (RMAA)
Across every scale and function, these projects highlight how our teams, clients and project collaborators use MiMEP to deliver safer, faster, more sustainable outcomes for communities.