Strengthening a critical corridor through innovation and partnership
The Brynderwyn Hills, a steep and slip-prone stretch of State Highway 1 (SH1). From 2022-mid-2023, this vital corridor between Northland and Auckland has been closed eight times due to landslides, underscoring the urgent need for a resilient solution. In response, NZ Transport Agency Waka Kotahi (NZTA) engaged WSP to provide detailed design services for recovery and widening works on the southern side of the Brynderwyns—approximately 2.3km of winding terrain.
This project, delivered in close partnership with Fulton Hogan and NZTA, has been a showcase of innovation, collaboration, and fit for purpose engineering. It began as a creative proposal in mid-2023, driven by the industrious efforts of WSP and Fulton Hogan staff.
The design philosophy centred on creating a minimum 12.5m road corridor, constructed over a planned 9 week full SH1 closure —wide enough to open to traffic while completing the slip repairs. This also accommodates future slope failures and maintains two lanes of traffic during remediation works. This pragmatic approach enabled a full recovery of the road and ensured the road may last another 10 to 15 years until a new SH1 route is available. The pragmatic approach also, enabled efficient construction within a short timeframe to minimise impact upon the transport network and the Northland region.