Rising 25 stories and encompassing 600,000 square feet, the new Osvaldo N. Soto Miami-Dade Justice Center is a towering testament to modern civic design, engineering ingenuity and the power of public-private partnerships (P3).
The courthouse is not only a striking addition to the Miami skyline but also a model for resilient, sustainable and efficient public infrastructure. It is the first social infrastructure P3 project completed in Florida.
WSP in the U.S. led the mechanical, electrical, plumbing (MEP) and fire protection design as well as construction administration services.
The courthouse serves all civil matters within the county. Lower floors house a three-story atrium entry, offices, administrative and arbitration rooms, holding cells, cafeteria/dining facilities and a parking garage. Floors 13 through 24 feature 46 finished courtrooms, with four additional rooms to be converted in the future. The top floor is reserved as shell space for future expansion.
Born from public need
Although the original courthouse, built in 1928, was in a severe state of disrepair, voters rejected a 2014 referendum that would have approved a $393 million bond — funded through a tax increase — to construct a new building.
“That’s when the county shifted gears and pursued a P3 to get the courthouse tower project up and running,” said David Kosterno, PE, C.Eng., MCIBSE, senior vice president of mechanical engineering and project manager for WSP. “That approach impacted taxpayers far less and as a result, it gained significant traction. By late 2019 the project team — including WSP — was in place.”
We worked closely with the architect HOK and comprehensive design team members throughout the design phase. Strict document controls were established early in the project, including maximized design sessions using Bluebeam for real-time review and comments, which kept the project on schedule.