One South Dearborn
Four months after being released to begin design, structural drawings were complete for this optimized 40-story, LEED Silver composite building. WSP USA responded to the developer’s challenging goals for both schedule and design efficiency with focused design and research in the areas of floor flatness, floor vibrations, dynamic wind behavior and corrosion protection of exposed steel—often working closely with other expert consultants.
Key Numbers
Stories
40