Rendering from the WSP archives shows the design of the Hampton Roads Bridge-Tunnel (HRBT) in 1969, prior to the construction of the second tunnel. WSP has worked with the Virginia Department of Transportation on a number of projects for the HRBT, dating back to the original tunnel's opening in 1957.
Credit: ©Virginia Department of Transportation
The South Island is a focal point of the HRBT expansion project.
Credit: ©Virginia Department of Transportation
Being part of this project is truly inspiring. It’s not only going to reshape how this community moves and connects. It also represents a bold step forward in engineering and collaboration.
The North Trestle Bridge city of Hampton to the North Island.
Credit: ©Virginia Department of Transportation
This is a once-in-a-lifetime project—not only for the Hampton Roads community, but for me personally. I was born and raised in this area, and I’ve experienced firsthand the challenges of traffic through the Hampton Roads Bridge-Tunnel. This expansion has been needed for decades, and to witness the cutting-edge technology and expertise being applied to make it happen is truly inspiring. I’m incredibly proud to be part of a team delivering such a transformative project for Virginia.
Length of new bored tunnels
7,900 ft
Depth of new bored tunnels
>170 ft below the harbor
