Engineering to support a 200-year service life
The Kruunuvuori Bridge has a specified design life of 200 years. This exceptionally long lifespan placed high demands on structural design, material selection and long term maintenance planning. Our team identified components that would be subject to the highest stresses and that cannot be replaced, which shaped key design decisions.
Concrete structures in the water fluctuation zone were designed to meet enhanced durability requirements. We detailed steel structures to reduce fatigue risks, particularly in joints and stiffeners, prioritising simple and robust solutions. We also addressed seasonal conditions, including snow and ice accumulation on cables, through structural measures that support safe operation and maintenance.
Using digital models to manage complexity over time
We delivered the project as a fully model based design across all technical disciplines, developing digital solutions to manage the bridge’s size and geometric complexity. In 2017, the project became one of the first bridge projects in the world to apply parametric modelling in bridge design.
During the development of the bridge, digital modelling improved coordination between disciplines and supported clearer collaboration with stakeholders through visualisation and testing of design alternatives. The digital approach continues to add value after delivery: our team developed a digital twin of the completed bridge that supports long term inspection, maintenance and asset management.
One integrated team across every discipline
WSP in Finland coordinated bridge and structural design, wind engineering, geotechnical and rock engineering design, infrastructure, traffic, architectural design and digital modelling within a single multidisciplinary team. This integrated approach allowed for close coordination across technical disciplines and supported efficient delivery of a complex maritime structure.
Recognised for digital bridge design
Kruunuvuori Bridge has received international recognition for its use of information modelling. In October 2024, the project won the Tekla BIM Awards Global competition, which recognises construction projects demonstrating excellence in digital design and delivery. Earlier the same year, the bridge also won Finland’s national BIM competition. And in 2025, the Finnish Concrete Association recognised it as the “Concrete Structure of the Year”.