WSP’s approach ensured that this project incorporated responsible and efficient resource development to power a lower carbon future. The natural gas produced by this project will be a clean option used for meeting energy demands of the future while supporting the increased demand to feed the local economy and to diversify to consumer goods.
WSP contributions supported VMLP attaining regulatory approval, which was acquired in 2018. After providing conceptual and detailed design, our team was responsible for ensuring all construction drawings were provided to VMLP to support the construction and fabrication activities. Construction planning is the responsibility of VMLP with WSP providing engineering support through construction, commissioning and turnover to Operations.
To meet our client needs WSP adapted a flexible project delivery approach, including:
- The use of client specific RFI tools.
- Direct-issue of engineered deliverables to contractors and managing on-line digital reviews of WSP stick-file drawings.
- Customized execution strategies to maintain project schedules while executing out-of-sequence engineering.
- Digital markups of engineering drawings, vendor documentation and project deliverables resulted in improved access and enhanced the client/engineer collaboration process.