The square was created in Georgian London
1710s
Consultation found 89% of respondents were supportive of the project
89%
bulbs were planted, with 1,600 shrubs and 15 new trees
8,000
Location
- London, United Kingdom
Client
- Westminster City Council | Portland Estates | New West End Company
Project Status
- Completed
From advisory to delivery, our WSP team was truly multidisciplinary allowing us to access internal experts and expertise to respond to any opportunities and challenges required to bring the client’s vision to life.
The changes to both the highway and the gardens have brought a whole new lease of life to the area to the benefit of numerous stakeholders including local businesses, landowners and residents alike.
Bringing nature back
- Planting includes 15 new trees, 1,600 shrubs and 8,000 bulbs to improve biodiversity
- Plane trees retained but their elevation raised to improve visibility and light
Sustainability and circular principles
- Footway materials were all sourced from within the UK including Yorkshire Paving
- Reclaimed granite was used in the scheme from the Thames Tideway Tunnel project
Climate resilience
- Permeable pavement used within the square
- Pavements specified with high albedor rating to reduce heat island
Heritage
- Restored the Grade II listed Cabmen Shelter
- New cast iron railings were commissioned in 19th century style
