Norwalk WALK Bridge Program

Replacement of 130-year-old movable bridge is centerpiece of a project to improve the busiest U.S. rail corridor.

Location

  • Connecticut, USA

Client

  • Connecticut Department of Transportation

Project Value

  • $1.6 billion

Project Status

  • Ongoing

Quick Fact

  • Built during Grover Cleveland presidency.

Quick Fact

  • Maintaining two tracks during construction.
img-1-walk-bridge

©WSP

img-3-walk-bridge

©WSP

img-4-walk-bridge

©WSP

Daily train crossings
200
Span length
564 feet
img-2-walk-bridge

©WSP

Building the bridge while maintaining operations for MetroNorth, Amtrak and freight rail across two tracks over the Norwalk River requires careful planning and execution to ensure safety and continuity of rail services.