
Norwalk WALK Bridge Program
Replacement of 130-year-old movable bridge is centerpiece of a project to improve the busiest U.S. rail corridor.
Location
- Connecticut, USA
Client
- Connecticut Department of Transportation
Project Value
- $1.6 billion
Project Status
- Ongoing
Quick Fact
- Built during Grover Cleveland presidency.
Quick Fact
- Maintaining two tracks during construction.
©WSP
©WSP
©WSP
Daily train crossings
200
Span length
564 feet
©WSP
Building the bridge while maintaining operations for MetroNorth, Amtrak and freight rail across two tracks over the Norwalk River requires careful planning and execution to ensure safety and continuity of rail services.