WSP was retained as the Prime Consultant by the Government of Costa Rica’s Ministry of Public Works and Transportation (MOPT), to provide overall project management, design, and contract administration for this $2.5 M project.
Serving as the prime consultant and equity investor, WSP was responsible for providing overall project management, design and contract administration services. The new terminal, named the “Coolest new airport terminal” in 2012 by Travel and Leisure Magazine replaced the existing aging and capacity-constrained terminal building with a 20,000 square metres, seven-gate multi-level passenger terminal building and the associated landside, airside and site services.