The Government of Canada is decarbonizing its operations, starting at the heart of the National Capital Region (NCR). Many buildings- including the Parliament Buildings- are connected via more than 14 km of underground piping to the federal government’s National Capital Region District Energy System (NCR DES). Much of this legacy system has reached end of life and relies on outdated technologies. The Energy Services Acquisition Program (ESAP) is transforming it into a safer, smarter, lower carbon network built for the next generation.
In 2019, the Government of Canada signed a 35-year contract with Innovate Energy to overhaul the system. By significantly reducing the energy intensity of heating and cooling, ESAP is projected to save nearly half a billion dollars between 2026 and 2055. It also delivers substantial GHG reductions compared to 2005 baselines.
Innovate Energy is a locally based consortium comprising PCL, Black & McDonald, and Equans with WSP, and bbb architects Ottawa Inc. as key subcontractors of the project. With over 1,800 construction workers involved, the project was ranked the 23rd largest infrastructure initiative in Canada in 2021. ESAP stands as a real-world example of how cities can decarbonize building operations, aligning with Canada’s leadership in clean tech and renewable energy.
WSP leads a multidisciplinary team spanning architecture, landscape architecture, structural, mechanical, electrical, plumbing, process, civil, environmental, geotechnical, sustainability, commissioning, and project management. This integrated approach enables cohesive design and delivery across complex plant, tunnel, bridge, and building interfaces.
Sensitive surroundings
Given the sensitive nature of the facilities served by the ESAP project, and the designation of the four Energy Centres (three newly constructed, one retrofit) as post-disaster facilities, design requirements were heavily influenced by the need for robust access control, surveillance, and emergency response capabilities.
WSP collaborated closely with the contractors, PSPC, and PSPC’s security consultant to ensure that the necessary infrastructure was integrated into the ESAP construction. This included key upgrades to support revised access control protocols and enhanced security monitoring systems.