Tapuaeharuru marae ātea Pou

At the heart of the Taupō Town Centre Transformation (TTCT) initiative is WSP's innovative engineering role, ensuring the stability of the iconic carved pou at Tapuaeharuru Marae Ātea. Achieving structural integrity, our solution was to use unconventional epoxy solutions to attach pou to concrete, preserving the artistic vision.

Completed in April 2023, the largest pou, carved from a 70-year-old tōtara log, stands 8 meters tall, weighing 6 tonnes. WSP's bespoke design ensures both client and artist satisfaction, enhancing the Taupō CBD's cultural centerpiece. 


Location

  • Waikato, New Zealand

Project Value

  • $500k

Project Status

  • Complete: July 2022 – April 2023

All image credit

  • Taupō District Council

Key Facts about the largest Pou

metres tall
8
tonnes 
6
metres in diameter at its widest point
1.1
years since logs were felled
70

People gathering around Pou in Taupo Town Centre

image of Tapuaeharuru marae tea Pou