Meet WSP at Data Center Expo 2026

Data centers are mission critical facilities where high availability and operational reliability are essential. Even a brief power outage can have major consequences for operations that rely on continuous data traffic and storage. This makes it crucial that the electrical system is robust, well designed, and prepared for different fault scenarios.
  • tiistai 26. toukokuuta 2026 8.00 Päivämäärä keskiviikko 27. toukokuuta 2026 17.00 (UTC+2)

Arne Beurlings Torg 5
164 40 Kista
Read more about the expo and get your tickets here:
https://datacentreexpo.se/

Annelie Hansson

Director Subsector Leadership Data Center

Sweden

Matthew Beck

Mission Critical Project Director

Norway

Jonas Rune

Senior Principal Environmental Engineering

Sweden

Jens Forsberg

Lead Advisor Business Development

Sweden

Matti Esko Järvenpää

Mission Critical Lead

Finland

David Higgins

Global Data Center Leader

UK


2026-05-26 08:00:00 2026-05-27 17:00:00 Europe/Stockholm Meet WSP at Data Center Expo 2026 Meet WSP at Data Center Expo 2026 Data centers are mission critical facilities where high availability and operational reliability are essential. Even a brief power outage can have major consequences for operations that rely on continuous data traffic and storage. This makes it crucial that the electrical system is robust, well designed, and prepared for different fault scenarios. tiistai 26. toukokuuta 2026 8.00 Päivämäärä keskiviikko 27. toukokuuta 2026 17.00 Europe/Stockholm Arne Beurlings Torg 5 164 40 Kista Read more about the expo and get your tickets here: https://datacentreexpo.se/ Arne Beurlings Torg 5 164 40 Kista

2026-05-26 08:00:00 2026-05-27 17:00:00 Europe/Stockholm Meet WSP at Data Center Expo 2026 Meet WSP at Data Center Expo 2026 Data centers are mission critical facilities where high availability and operational reliability are essential. Even a brief power outage can have major consequences for operations that rely on continuous data traffic and storage. This makes it crucial that the electrical system is robust, well designed, and prepared for different fault scenarios. tiistai 26. toukokuuta 2026 8.00 Päivämäärä keskiviikko 27. toukokuuta 2026 17.00 Europe/Stockholm Arne Beurlings Torg 5 164 40 Kista Read more about the expo and get your tickets here: https://datacentreexpo.se/ Arne Beurlings Torg 5 164 40 Kista