Meet WSP at Data Center Expo 2026
Data centers are mission critical facilities where high availability and operational reliability are essential. Even a brief power outage can have major consequences for operations that rely on continuous data traffic and storage. This makes it crucial that the electrical system is robust, well designed, and prepared for different fault scenarios.
-
den 26 maj 2026 08:00 till den 27 maj 2026 17:00 (UTC+2)
Arne Beurlings Torg 5
164 40 Kista
164 40 Kista
Read more about the expo and get your tickets here:
https://datacentreexpo.se/
https://datacentreexpo.se/
Annelie Hansson
Director Subsector Leadership Data Center
Sweden
Matthew Beck
Mission Critical Project Director
Norway
Jonas Rune
Senior Principal Environmental Engineering
Sweden
Jens Forsberg
Högberg
Lead Advisor Business Development
Sweden
Matti Esko Järvenpää
Mission Critical Lead
Finland
David Higgins
Global Data Center Leader
UK
Andrew Johnston
Director – Head of UK DC Centre of Excellence
UK
2026-05-26 08:00:00
2026-05-27 17:00:00
Europe/Stockholm
Meet WSP at Data Center Expo 2026
Meet WSP at Data Center Expo 2026
Data centers are mission critical facilities where high availability and operational reliability are essential. Even a brief power outage can have major consequences for operations that rely on continuous data traffic and storage. This makes it crucial that the electrical system is robust, well designed, and prepared for different fault scenarios.
den 26 maj 2026 08:00 till den 27 maj 2026 17:00
Europe/Stockholm
Arne Beurlings Torg 5
164 40 Kista
Read more about the expo and get your tickets here:
https://datacentreexpo.se/
Arne Beurlings Torg 5
164 40 Kista
2026-05-26 08:00:00 2026-05-27 17:00:00 Europe/Stockholm Meet WSP at Data Center Expo 2026 Meet WSP at Data Center Expo 2026 Data centers are mission critical facilities where high availability and operational reliability are essential. Even a brief power outage can have major consequences for operations that rely on continuous data traffic and storage. This makes it crucial that the electrical system is robust, well designed, and prepared for different fault scenarios. den 26 maj 2026 08:00 till den 27 maj 2026 17:00 Europe/Stockholm Arne Beurlings Torg 5 164 40 Kista Read more about the expo and get your tickets here: https://datacentreexpo.se/ Arne Beurlings Torg 5 164 40 Kista