PROJECT DESCRIPTION
Construction of fixed wharf on the Ohinemuri River in Paeroa, to be used as a connection on the Hauraki Rail Trail and opening upboat ride offerings from Paeroa Maritime Park into the Paeroa Township.
CLIENT BRIEF/PROJECT CHALLENGES
The client requirements were extensive,including vessel size, berthing and mooring, vessel embarking and loading arrangements, wharf loadings and the river environment.
OUR SOLUTION
We developed a user requirements document prior to starting the design of the wharf which was reviewed and approved by the client.
OUTCOME/CLIENT BENEFITS
Creating a connection to the water for the community in the centre of town. This allows access to the water where it was previously not possible.
LIST OF PRIMARY SERVICES
- Resource consents
- Site Survey
- Ground Investigation
- Detailed design of wharves
- Building Consents
- Tendering
- Construction Monitoring