The scale of the task ahead is gargantuan, riddled with engineering, environmental, and logistical complexities. Yet history has shown the key to success lies in smart design standardisation as well as the adoption of modern methods of construction (MMC) - approaches that promise to make the process faster, more efficient, and easier on the public purse.
WSP is already setting a benchmark in this space. Projects like the Homer Tunnel show how innovation and standardisation can deliver faster, more efficient outcomes. Recent bridge replacement projects have also demonstrated that, with the right planning and technology, even the most challenging rebuilds can be completed with minimal disruption and maximum efficiency.
In doing so, it’s useful to look back through history. Jeremy Waldin, WSP's Head of Bridges, Maritime and Structures, says the first large wave of bridge building in New Zealand happened in the mid-19th century.
“These first-generation bridges were typically constructed from timber, wrought iron or cast iron and often constructed using techniques imported from the UK and Europe. The majority of these structures were replaced throughout the 20th century typically due to durability issues, capacity constraints or damage in major flood events”.